The
project has been envisioned from two pressing necessities of HCM
City:
1. Construction of a new deep-sea port accommodating the growing
domestic and international cargo transport.
2. Expansion and linkage of river transport with sea transport in
the regions.
Present
Status of Maritime Navigation
From
Nha Be (HCM City) to the Eastern Sea, vessels may sail through one
of the two natural rivers:
Line
1: Entering Long Tau river from Nha Be until Nga Bay estuary (Ganh
Rai Bay), 63 kms long. Currently, this permanently overused line
turns out to be the most important maritime navigation route of
Vietnam. However, the expansion of the channel for 30,000 - 50,000
tons vessels runs into trouble due to factual reasons:
- The route
is subject to meanders, the convolution of some of which remains
at 450 meters causing trouble to vessels when making a turn-around
and accidents may happen.
- The riverbed
is narrow, some sports have 380-430 meters wide, affecting the
speed of vessels and consuming more fuels.
- Due to complicated
topography, the costs of politage and signaling are quite high.
Line
2: From the Nha Be - Soai Rap River, one goes straightforward to
Soai Rap estuary, about 50 kms long. In the two decades of 1950s
- 1960s, the channels of international vessels declined at Soai
Rap estuary owing to the narrow bed river and security reasons during
wartime. But this route avails itself of its relative straightness,
of more than 1,000 meters width and of short circuit. The alternative
for expansion of vessel channels through the Soai Rap River appears
thus more viable.
Project
Objectives
- To create
a new, safer and shortened channel for international vessels of
greater tonnage;
- To exploit
sand for the leveling up of the low, saline and marshy lands and
to set up new site grounds for construction of new urban agglomerations
and industrial zones;
- To enable
the building of a large seaport.
Investigation
Works
- Study on
the sectional analysis of the meander after the Nha Be - Long
Tau effluents for improving the maritime navigation in the existing
natural conditions;
- Preparation
of process for dredging Soai Rap river channels and study on the
stability of these channels;
- Study on
the efficiency and impact of dredging works upon the hydrologic
regime of the network of Dong Nai - Saigon downstream and the
changes in saline infiltration map.
The
investigation works were finalized in late 1994 and proved well
the feasibility of the dredging project.
|